Meeting Basics
DATE: Tuesday, April 16th
Project Description
The project will include, but is not limited to milling and resurfacing of the pavement, spot curb and sidewalk replacement, installation or upgrade of sidewalk curb ramps, replacement of traffic pavement markings, and adjustment and repair of manholes, catch basins, and water valve castings.
The project also includes recommendations for lane reductions and parking regulation changes on Culver Road south of Norris Drive, bicycle accommodations, curb bump-outs at select locations, and other safety improvements throughout the project corridors.
A pedestrian refuge island is proposed for the midblock crosswalk on Monroe Avenue at Werner Park.
Anticipated Project Timeline
Preliminary Design: June 2024
Final Design: October 2024
Bidding and Award: Winter 2024/5
Construction: April-November 2025
The public meeting date was initially scheduled for April 17th. It was changed to April 16th due to a scheduling conflict with the Mayor's "State of the City" Address. The public notice document below indicates April 17th. It has not yet been corrected.